Capital Improvement Project Photos
8711 - The grease interceptor for the new kitchen is put in place.
8719 - The old oak floor in the Fireside Room is removed.
8724 - A closeup view of the new casement windows.
8740 - Refinished beadboard ceiling and new casement windows in the Piano Room
8741 - The new Garden Shed addition is framed.
8737 - The new gas fireplace is constructed in the Lobby.
8744 - New lighting is installed in the Fireside Room.
8751 - Kitchen equipment being loaded in through the window.
8777 - New oak flooring is laid in the Fireside Room.
8776 - Jim the electrician in a crawlspace showing the original wood roof.
8796 - The Dining Room exterior with new casement windows in place.
8805 - The handmade, pinecone-embossed tiles used on the new fireplace.
8810 - Judd Evans, Evergreen metalsmith, finishes hammered copper piece for fireplace.