header background image
Current Weather 70° F
  • The Re-Roofing Process

     

    When a roofing permit has been issued, the following information is provided to help homeowners and professionals understand the inspection process:

    • The building permit card must be posted where it is accessible and visible from the street.
    • Access to the roof must be provided to areas taller than one story.
    • Inspections requested by phone must be called in by 5:30 p.m. the day before the inspection. If using the online system, inspection requests may be made up to 6 a.m. the day of the desired inspection.

     

    Two inspections are required:

    1. A mid-roof (when more than 10 percent, but less than 25 percent of the roof is complete).
    2. A final roof inspection (when the roof is complete).

     

    When the roof has passed the final inspection, a green sticker with the inspector's signature will be affixed to the permit card. This will provide you with a permanent record of the inspections.

    Resources

    Jeffco Permit Search
    Progress of inspections may be followed with this application; search by address, permit number/type or contractor.

    Re-Roofing permits online
    Apply for these permits online with our online permitting and inspections application

    Permit Fees
    See what your fees might be, calculation by valuation.

    Construction Advice
    Get some tips on selecting a contractor.

    Last Updated: 12-31-2013