Jefferson County Energy Calculations:
Commercial
Based on Climate Zone 5 per the 2009 International Energy Conservation Code.
All projects will need to meet or exceed the requirements of the 2009 IECC Chapter 5 ASHRAE/IESNA 90.1 or simulated energy performance analysis per the 2009 IECC Section 506. Simulated energy methods per Section 506 will be permitted on the plans with a PE stamp on the drawings.
New Commercial Buildings or Commercial Additions will require (COMcheck) or prescriptive measures of Chapter 5, 2009 IECC for the building thermal envelope, mechanical systems and electrical/lighting.
Tenant Finishes and changes of occupancy will require (COMcheck) for mechanical and interior lighting.
New homes - 4 methods
1. Prescriptive per Chapter 11 of the 2009 IRC
2. UA Alternative per the 2009 IRC/REScheck
3. Performance per section 404 of the 2009 IECC
4. Professional design
Additions, Alterations or Repairs - 2 methods:
1. Prescriptive per Chapter 11 of the 2009 IRC
2. Professional design
See Residential Energy Code Submittal Requirements - includes Manual J and Manual D requirements.
Worksheets for energy code, Manual D and Manual J:
Duct sizing worksheet (pdf)
Effective length calculation worksheet (pdf)
Friction rate worksheet (pdf)
Requirements for Installation of Photovoltaic Systems
Commercial
Residential
Governors Energy Office Website: www.colorado.gov/energy
Last Modified: May 21, 2010 07:34 AM