Project Hall of Fame
| Roadway Projects |
Drainage Projects |
|
|
|
NEAT Village Trail
Project Scope:
The project includes an approximately half-mile long 6-foot wide concrete trail along the east side of Bergen Parkway from the Bergen Village commercial development south to the existing trail at Broadmoor Drive. The Neat Village Trail is the second phase of the larger NEAT Trail system that will connect local subdivisions, three public schools, recreational areas, the fire department, and six shopping areas. Trail planning was completed by Transportation and Engineering Division staff, the NEAT board and steering committee, with input from the Denver Mountain Parks staff, and the Evergreen Park and Recreation District. The 6-foot wide concrete trail has a maximum slope of 6.5%. It incorporates a minor redi-rock retaining wall, inlets, culverts, ADA curb ramps, re-seeding of disturbed areas, and erosion control measures. The Road and Bridge Division constructed the trail. The project was funded by Conservation Trust Funds, which is Colorado Lottery money that is used to fund local parks, recreation facilities, open space and wildlife habitat. The cost of the project was approximately $290,000.
Project Update:
Design continues on the trail. The entire trail will be detached from either new or existing curb and gutter. A meeting with Denver Mountain Parks (DMP) to discuss the alignment through the park was conducted in October. An agreement between Jeffco & DMP is being worked on to allow Jeffco to construct the trail on DMP's property and for DMP to maintain it. Work continues on right-of-way or easement dedication from a few property owners along the proposed trail alignment between Keystone and Broadmoor.
Project Schedule:
Design: Start: September 2010 End: January 2011 Construction: Start: Summer 2011 End: Fall 2011
Project Manager:
Contact Brent Soderlin at Jefferson County at (303)271-8456 or bsoderli@jeffco.us if you have any questions or concerns.
Back To Top
Chatfield Avenue (South Everett Street to South Wadsworth Blvd.) - Phase I-2010
What was constructed?
Jefferson County contracted design services from Merrick & Company to develop the Phase I plans for widening the intersection of West Chatfield Avenue and South Wadsworth Boulevard. Merrick’s engineers also designed Phase II Chatfield improvements west of Wadsworth.
Phase I improvements to Chatfield included double left turn lanes in the eastbound and westbound directions, two through lanes, and right turn lanes in all directions. Raised concrete medians, intersection islands and a new sidewalk on the south side of Chatfield were also added. These features were intended to significantly increase vehicle capacity at this busy intersection so drivers spend less time waiting. The safety of both drivers and pedestrians was improved by the medians and sidewalks.
The County awarded the Phase I roadway construction contract to Concrete Express, Inc. (CEI) in late May. After securing the necessary permits, CEI was issued Notice to Proceed July 20, 2009.

West Chatfield Avenue looking east from South Wadsworth Court
View West Chatfield Phase I Plans
Back to Top
Golden Gate Canyon Road Realignment-2010
Project Scope: The County identified several areas for improvement last year based on safety of the traveling public, lack of roadway shoulders, and lack of clear zone for existing structures. County engineers, the County geologist, County road and Bridge supervisors, and a private consultant identified Curve 1 and Curve 2 as areas in need of safety improvements.
Curve 1 has an existing large rock overhang that is in need of rock bolting and scaling. In addition, the Couty is moving the road out toward the east to provide for a safety buffer with jersey barriers between the vehicles and this safety area. The area is approximately twelve feet wide and will provide an area for rocks to fall into and not fall on vehicles below. The County can then move in and remove this debris safely without closing the road.
Curve 2 is a curve on a pinch point that has a rock outcrop right next to the shoulder. The curve also has several large rocks already dislodged that can move or fall at any time. There is no shoulder to provide a safe fall zone between the rock and vehicular traffic. The amount of removal is relatively small, and will provide a much needed safe fall zone. In addition to this rock removal, the areas around Curve 1 and Curve 2 will receive rock scaling to remove potentially loose rock from falling on the road or the traveling public. The County is hiring a professional rock stabilization company who is highly experienced at knowing how and when a rock needs to be removed or supported by anchors. The County forces will not be doing this work; they will be assisting in the removal of the rock.
Construction is expected to cost $250,000 and will be funded through traffic impact fees collected for Golden Gate Canyon Road.
Back to Top
McIntyre Outfall at Swamp Angel Detention Basin-2010
Urban Drainage and Flood Control District (UDFCD) and Jefferson County contracted design services with Olsson Associates to develop the plans to increase the storage capacity of Swamp Angel Detention Pond and thus help alleviate drainage problems in the Fairmount area.
The Swamp Angel Pond is located southwest of McIntyre Street and 50th Avenue in the Coors Technology Center. A portion of McIntyre Street between 50th Avenue and Table Mountain Parkway was raised, and the western portion of the pond bottom excavated to increase the stormwater storage capacity from 26 acre-feet to 53 acre-feet. Storm sewer was constructed in McIntyre Street between Table Mountain Parkway and the Croke Canal to transport the runoff into the Clear Creek drainage system.

South Pond Outlet Structure

North Pond Plantings
Back to Top
Plainview Road Over Coal Creek - Bridge Repair Project-2010
Plainview Bridge Completed
|
Plainview Road is located west of State Highway 93 and north of State Highway 72, just before Coal Creek Canyon. Repairs were planned for the deck and concrete girders, as years of poor drainage had deteriorated the surfaces. New bridge rail was added and guardrail was extended to improve vehicle safety along the sides.
Jefferson County used the design and construction oversight services of Lonco, Inc., a well-known bridge design frim in the Denver area. ABCO Contracting was awarded the construction contract.
Work was conducted so that one-half of the bridge was repaired at a time. As a result, traffic was restricted to only one lane crossing the bridge at all times. Signs and barriers directed drivers safely around the work zones.
The funds for the bridge repairs came from the new FASTER fees charged for vehicle registrations. The project is expected to cost less than $150,000.
ABCO Contracting completed the work as of October 25, 2010. |

Close-up View of the New Bridge
Back to Top
Sutton Road Shoulder Widening/Trail Project-2010
Completed Widening by Community Center
This project consists of building a 4-foot wide concrete pan with a 4-foot wide concrete shoulder. The concrete pan and shoulder was constructed along the north side of Sutton Road between Davis Avenue (King Sooper's retail center) and Wolff Avenue (West Jefferson County Elementary School) in Aspen Park, Colorado. The design also included updating existing storm sewer crossings and installing inlets and additional storm sewer to collect minor storm events. The template for Sutton Road consists of a minimum 22-foot wide asphalt paved roadway with a new 4-foot wide concrete drainage pan and a 4-wide concrete shoulder. The project is approximately 3,000 feet in length.
This widening project is a multi-use space for pedestrians and bicyclists along a local thoroughfare that links West Jefferson Elementary School with the commercial area of Aspen Park Shopping Center. This shoulder is also the first link in a larger project to provide connectivity across the northern section of Aspen Park. Ultimately, the plan is for a link connecting Flying J Open Space Park with Meyer Ranch Open Space.
Jefferson County’s contractor Technology Constructors Inc. has completed the majority of the concrete pan and shoulder between Wolff Avenue and Dallman Drive. Some minor slope stabilization and seeding has also been completed in the area.
The contractor has installed storm sewer between Dallman Drive and Davis Avenue.
Final Cost: $482,000
Sutton Road Trail Graphic
Back to Top
West Bowles Avenue & South Wadsworth Intersection Improvements
|
|
|
August, 2011 |
Project Summary: This project was designed to improve traffic flow and drainage through the intersection with the addition of:
- 2 left turn lanes from eastbound W. Bowles Avenue to S. Wadsworth Boulevard;
- A third lane on southbound Wadsworth;
- Enhanced access to the east side of Southwest Plaza;
- Right turn lanes and improved traffic signals with islands throughout the intersection;
- Sidewalk extensions;
- New storm sewer and a water quality pond; and
- Pedestrian access across and over the intersection and with improved signals and a pedestrian bridge.
The intersection and bridge became fully accessible to vehicles, pedestrians and cyclists August 2, 2011. The general contractor, American Civil Constructors, has been completing "punch list" repairs. All work is expected to be complete in September 2011.
This project was funded through two grants from the Federal Highway Administration and Jefferson County's Southeast One-Half Sales Tax program.
Project Manager: Contact Dixie Shear at the Jefferson County Transportation & Engineering Division at 303-271-8495, or dshear@jeffco.us
Back to Top
Deer Creek Canyon Road Shoulder Widening
Update: April 11, 2011
Project Scope: This project is a continuation of the Deer Creek Canyon Road shoulder widening project of 2006. This project begins at south Owens Street and extends approximately 1500 feet west of south Owens Street. This section of Deer Creek Canyon Road is a narrow two land road and shoulders are virtually non-existent. Safety will be greatly enhanced in these areas by adding a four-foot wide shoulder to the north side and a section of guardrail on the south side where Deer Creek converges with the roadway.

The project is being funded by Jefferson County and is anticipated to cost approximately $400,000.
Project Update:
KECI Colorado, Inc. was awarded the construction contract in October, 2010.
What Has Been Done So Far:
Construction started on October 25, 2010, and the first phase was completed on December 31, 2010. Construction resumed on March 21, 2011. The project is substantially complete. The following items have been completed:
• Clearing of trees and vegetation
• Installation of irrigation and storm sewer pipe
• Retaining wall installation to improve visibility at South Owens Street
• Masonry wall to support new concrete curb and gutter
• Concrete pans, curb and gutter
• Drainage improvements in Xcel Substation parking lot
• Approximately 800 feet of shoulder widening on the north side of Deer Creek
Canyon Road
• Completion of irrigation structures
• Grading and resurfacing of the Xcel Energy Substation parking lot
• Milling and removal of asphalt
• Widening and paving the south side of Deer Creek Canyon Road on the west end
of the project
• Seeding of disturbed areas
• Guardrail installation
What Is Remaining:
• Final striping and signage of the project
Project Manager: Contact John Conn with Jefferson County at 303.271.8496 or jconn@jeffco.us if you have questions or concerns.
Back to Top
Back to the Construction Projects Page
White Ranch Open Space Park - Belcher Hill Road Improvements - 2011
Project Scope: This project begins at the west entrance to the White Ranch Open Space Park and continues approximately a half-mile to the parking lot. The purpose of the project is to pave the road, which will entail minor road grade modifications, cross culvert replacement, and parking lot area drainage improvements.
The project is being funded by Jefferson County Open Space and is anticipated to cost approximately $210,000.

Project Update: The project is under construction by the Road and Bridge Division.
What Has Been Done So Far:
Construction started on November 8, 2010 and the following has been completed:
• Road cross culverts replaced
• Entry road grading - road base stockpiled, road cut to grade, side slopes
established
• Two trees removed
• Parking lot area storm sewer inlets and pipes installed
• Driveway culvert installed
• Ditch re-graded
• Power pole relocated
What Is Planned For Spring 2011:
• Road paving
• Installing roadway signage
• Seeding of disturbed areas
Contact Jefferson County at 303.271.8495 or if you have questions or concerns.
Back to Top
6th Avenue Frontage Road Trail Project
Project Scope: This project consists of constructing curb, gutter and an 8-foot wide sidewalk along the south side of the frontage road between Gladiola Street and Deframe Court in Golden. An approximately 3-foot high, 200-foot long retaining wall will be built east from Gladiola Street. The design also includes extending the existing storm sewer at Gladiola and providing handicap access in the medians at Gladiola Street and Flora Way.
The project, approximately 2,000 feet in length, is being designed by Jefferson County staff. The Road and Bridge Division will construct the improvements. Conservation Trust Funds are being used to fund the project.
Progress Update: CDOT, City of Lakewood, and College Park Water & Sanitation District have approved the plans. Construction starts mid-April. Generally, both lanes of 6th Avenue Frontage Road will remain open during construction. Some daytime lane closures on 6th Avenue Frontage Road are expected and will be managed by flaggers.
Project Schedule:
Design Start: April 2010 End: December 2010
Construction Start: April 18, 2011 End: September 2011
Project Manager: Contact Brent Soderlin with Jefferson County at 303.271.8462 or bsoderli@jeffco.us if you have questions or concerns.
Back to Top