header background image
Current Weather 75° F
  • Public Health

    Are there exceptions to the requirement for obtaining a use permit?


    Answer:

    Yes. A dwelling or structure that was first occupied (as determined by the date of the warranty deed transferring ownership from the developer or builder to the original homeowner) less than five years before the closing date does not require a use permit, provided the existing system was not used for a previous dwelling on the site.






    Last Updated: 3-20-2013