    Answer:

    Not necessarily. If the owner obtains a repair permit from the department to repair or upgrade the system AND the prospective buyer signs a written agreement (form 900Download Adobe Reader from Downloads Page) to repair or upgrade the system within 30 days of occupying the structure, the department will waive the requirement for a use permit.