    What does the department do before issuing the use permit?


    Answer:

    The Department:

    1. reviews the submitted inspection reports;
    2. checks files to determine whether we have information on the size, capacity and components of the system;
    3. checks the records to determine whether there are past or current reported operational problems with the system within the previous three years and, if everything is acceptable;
    4. issues the permit with the appropriate conditions.