    In December 2004, a corridor study was completed for West Chatfield Avenue, between South Kendall Boulevard and West Ken Caryl Avenue.

    The study, designed to establish a conceptual corridor improvement plan and phasing of the projects, recommended widening the arterial to four lanes with median and turn lanes as appropriate.

    See the West Chatfield Avenue Corridor Study Download Adobe Reader from Downloads Page; conceptual plans can be found in Appendix A.